Procurement & Scale — Bana Supply Chain

Bana Sourcing
Process

A streamlined fabric sourcing workflow designed for speed, quality, and enterprise scalability. From brief to bulk in a single, structured procurement track.

< 24h

RFQ Response

7 Days

Swatch Lead Time

15 Days

Pilot Production

99.8%

QC Pass Rate
5-Stage Procurement Workflow
End-to-End Sourcing Workflow
Step 1 — Swatch Request
Day 1
Submit your fabric brief via RFQ. Include composition, GSM, end-use, and target volume. Our sourcing team reviews within 24 hours.
STAGE DELIVERABLES
  • RFQ confirmation
  • Sourcing brief review
  • Category team assignment
Step 2 — Sample Development
Days 2–7
Lab dips and physical swatches developed against your specification. Fabric hand, weight, and construction reviewed by QC team before dispatch.
STAGE DELIVERABLES
  • Lab dip approval
  • Physical swatch kit
  • Spec sheet draft
Step 3 — Bulk Production
Days 8–22
Approved samples move into scheduled production. Mill allocation based on order volume, certification requirements, and lead time priority.
STAGE DELIVERABLES
  • Production schedule
  • Mill allocation
  • In-line QC reports
Step 4 — Quality Control
Days 23–25
4-point inspection system applied across 100% of bulk output. Physical testing for tensile strength, colour fastness, dimensional stability, and shrinkage.
STAGE DELIVERABLES
  • 4-Point QC report
  • Lab test certificate
  • Packing inspection
Step 1 — Swatch Request
Day 26+
Submit your fabric brief via RFQ. Include composition, GSM, end-use, and target volume. Our sourcing team reviews within 24 hours.
STAGE DELIVERABLES
  • Shipping documentation
  • Certification pack
  • Repeat-order setup
Click any step to view details
4-Point Quality Control System
Enterprise Quality Standards
Physical Testing
Tensile strength, tear resistance, pilling
Colour Fastness
Wash, rub, sweat, and light fastness
Dimensional Stability
Shrinkage after 5 washes
Certification Audit
GOTS, OEKO-TEX, BCI compliance
01
TIME-LINE
Day 1
Swatch Request
Submit your fabric brief via RFQ. Include composition, GSM, end-use, and target volume. Our sourcing team reviews within 24 hours.
STAGE DELIVERABLES
  • RFQ confirmation
  • Sourcing brief review
  • Category team assignment
02
TIME-LINE
Day 2 - 7
Sample Development
Lab dips and physical swatches developed against your specification. Fabric hand, weight, and construction reviewed by QC team before dispatch.
STAGE DELIVERABLES
  • Lab dip approval
  • Physical swatch kit
  • Spec sheet draft
03
TIME-LINE
Day 8 - 22
Bulk Production
Approved samples move into scheduled production. Mill allocation based on order volume, certification requirements, and lead time priority
STAGE DELIVERABLES
  • Production schedule
  • Mill allocation
  • In-line QC reports
04
TIME-LINE
Day 23 - 25
Quality Control
4-point inspection system applied across 100% of bulk output. Physical testing for tensile strength, colour fastness, dimensional stability, and shrinkage.
STAGE DELIVERABLES
  • 4-Point QC report
  • Lab test certificate
  • Packing inspection
05
TIME-LINE
Day 26+
Scale & Dispatch
Approved bulk shipped with full documentation — test reports, certifications, and commercial invoice. Repeat orders auto-scheduled for scale.
STAGE DELIVERABLES
  • Shipping documentation
  • Certification pack
  • Repeat-order setup

Enterprise fabric procurement platform for export houses, D2C brands,
and production managers. India-based, globally compliant.

CERTIFIED SOURCING CAPABILITY
We source fabrics through a network of partner mills holding GOTS, OEKO-TEX, BCI, REACH, ISO 9001 and other international standards. Certified fabric is available on request, with the partner mill's certificate provided at the time of order confirmation.
© 2026 Bana Textile Pvt. Ltd. All rights reserved. Registered in India.
privacy
terms
cookie policy
X
Procurement Enquiry Form
Submitted data is processed per our Privacy Policy androuted through HubSpot enterprise CRM.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.